Uptown Riverwalk

The mixed use development, Uptown,  resulted in the DDA commiting to repair and extend the riverwalk from the Union Street bridge to the end of the property line. The pedestrian connection Pine Street and the planned future riverwalk along Uptown’s river frontage was a cost effective and exciting way to procede with this public/private partnership.

The Riverwalk project also included the replacement of the steps and walkway under the Union Street Bridge.

Gourdie Fraser was hired for the design and engineering for this project and Elmer’s has been awarded the contract to construct. The Riverwalk is near completion and will be completed in Spring 2020.

FUNDING: TIF 97